Full View Sanitary Sight Flow IndicatorAssembly InstructionsThis unit is assembled at the factory and is ready for installation into pipeline. This sight glass should be visually checked for any possible damage during shipping. After the unit has been installed, heated and pressurized, it should be checked for any possible leakage. lf leakage occurs, follow step (i) and (j) until leakage has stopped. When installing spare parts, refer to steps (a) through (k).
NOTE: After the unit has been heated and pressurized several times, the 3/3" hex nuts (1) should be checked for tightness. |